Friday, September 19, 2014

F-35A runway requirements

Here are what the RAAF thinks about F-35A runway requirements via a submission to Hansard. Since they have a history of not doing any real analysis with this program, you can read them as LM words.

Runway Requirements. Sufficient runway length is required to ensure the safety of pilots operating the F-35A. The key safety consideration is the reaction time which a pilot has available to abort a take-off and safely stop the aircraft within the runway length. Considerations used to calculate the safety margin include runway length, whether afterburners are used to accelerate the aircraft to take-off speed faster, and the weather. The F- 35A requires a minimum runway length of 8,000 feet to safely operate. At RAAF Base Williamtown, because there is no two-seat version of the F-35A to allow trainee pilots to practice under direction supervision, a runway length of 10,000 feet is required to provide trainee pilots with an additional safety margin compared to that afforded to experienced pilots. Further, a 10,000 foot runway is required at RAAF Base Williamtown to support Air Force’s strategy for noise mitigation.

It will be interesting how Canada considers that with two, deployable fields. One being 5999 feet.


---

-Time's Battleland - 5 Part series on F-35 procurement - 2013 
-Summary of Air Power Australia F-35 points
-Bill Sweetman, Aviation Week and the F-35
-U.S. Government Accounting Office (GAO) F-35 reports
-F-35 JSF: Cold War Anachronism Without a Mission
-History of F-35 Production Cuts
-Looking at the three Japan contenders (maneuverability)
-How the Canadian DND misleads the public about the F-35
-Value of STOVL F-35B over-hyped
-Cuckoo in the nest--U.S. DOD DOT&E F-35 report is out
-6 Feb 2012 Letter from SASC to DOD boss Panetta questioning the decision to lift probation on the F-35B STOVL.
-USAFs F-35 procurement plan is not believable
-December 2011 Australia/Canada Brief
-F-35 Key Performance Perimeters (KPP) and Feb 2012 CRS report
-F-35 DOD Select Acquisition Report (SAR) FY2012
-Release of F-35 2012 test report card shows continued waste on a dud program
-Australian Defence answers serious F-35 project concerns with "so what?"
-Land of the Lost (production cut history update March 2013)
-Outgoing LM F-35 program boss admits to flawed weight assumptions (March 2013)
-A look at the F-35 program's astro-turfing
-F-35 and F-16 cost per flying hour
-Is this aircraft worth over $51B of USMC tac-air funding?
-Combat radius and altitude, A model
-F-35A, noise abatement and airfields and the USAF
-Deceptive marketing practice: F-35 blocks
-The concurrency fraud
-The dung beetle's "it's known" lie
-F-35's air-to-air ability limited
-F-35 Blocks--2006 and today
-The F-35B design is leaking fuel
-F-35 deliveries
-ADF's wacky F-35 assumptions
-Gauging performance, the 2008 F-35, Davis dream brief
-Aboriginal brought out as a prop
-Super Kendall's F-35 problem
-LM sales force in pre-Internet era
-History of F-35 engine problems
-Compare
-JSF hopes and dreams...early days of the Ponzi Scheme
-The Prognostics

No comments: